Land Partnership
Get a brand-new, fully compliant building on your land or in place of your old building — without bearing any construction cost.

01
You bring the land, we take care of the rest.
From you
- Your land or old building
- Title deed and zoning documents
- A contract signed at the notary
From us
- All design, permit and construction costs
- Borehole soil survey and TBDY 2018-compliant structural design
- Municipality, building inspection and land registry procedures
- Statutory warranty after handover
In the end
The independent units agreed in the contract are handed over to you with their title deeds, together with the occupancy permit.
02
Why partner with Doff?
- Notarised security
- Shares, delivery date and penalties are secured by contract.
- Urban renewal
- The full renewal process, from risk assessment to the new building.
- Transparent tracking
- Follow every stage through regular reports and site visits.
03
From first meeting to handover.
- 01
Initial meeting
We listen to your needs and inspect the site in person.
- 02
Zoning & feasibility
Zoning, floor-area ratio and cost analysis produce a clear roadmap.
- 03
Contract
Shares and delivery date are secured with a notarised contract.
- 04
Design & permits
Architectural, structural and MEP designs are prepared; the building permit is obtained.
- 05
Construction
Built under licensed inspection, with regular progress reports.
- 06
Handover
The occupancy permit is obtained and units are handed over with title deeds.
04
Frequently asked questions
How is the share ratio determined?
The ratio is set through a feasibility study based on location, zoning (floor-area ratio, number of floors), plot size and local market values, and is stated clearly in the contract.
How does the contract process work?
The agreed terms are signed at a notary as a land-share-for-construction contract, including the delivery date, delay penalties and guarantees.
What safeguards does the contract include?
The delivery date, penalty clauses for delay, a technical specification of the materials to be used, and tying the transfer of the contractor's units to construction progress are all written into the contract. Additional guarantees such as a bank letter of guarantee can be discussed where needed.
When are title deeds transferred?
Once condominium rights are established, the contractor's units are transferred in stages as the construction milestones set in the contract are reached. The landowner's units are handed over together with the occupancy permit.
How is earthquake resistance ensured?
The structural design is prepared to the Turkish Building Earthquake Code (TBDY 2018) using soil survey data. Works are supervised by a licensed building inspection firm, and concrete and rebar samples are lab-tested.
Where will I live during construction?
For urban renewal projects we guide you through statutory rent assistance; additional rent support can also be agreed in the contract.
How does it work for jointly owned plots?
We meet with all shareholders and advise on the required majority and legal procedures.
Which cities do you work in?
We are based in Ankara and evaluate suitable plots across Türkiye.
How soon will you respond?
We usually complete the preliminary assessment within a few business days and contact you.
Let us evaluate your land
Leave your details and our specialist will call you for a free preliminary assessment.

